公開日 2017.07.27
Operation Confirmation Test by NACCS Center
NACCS Center will conduct operation confirmation tests regarding system switching between Main Center and Back-up Center of 6thgeneration NACCS in the following date;
(1) Switching from Main Center to Back-up Center; Friday, July 28, 2017, 12:00 p.m. to 12:40 p.m. (JST)
(2) Switching-back to Main Center; Monday, July 31, 2017, 3:00 a.m. to 4:00 a.m. (JST)
【SP】Please check if system automatic switching by DNS will work without any problems.
【Filers】No specific action is needed. However, please note that Running Test is not available in the above duration.